"I cannot thank you enough for your service. It is a rare thing to find a firm these days that deal with people in a polite and efficient way."

Tuesday, 27 June 2017

Working heights to 42 meters

A new ommelift 4200 takes our overheadworks up to 42 meters.
Put straight to work on tower block window cleaning for Fortis Living Group.
Hydraulic hose to basket allows safe high level pressure washing.
The crawler chassis deals with all types of terrain.

Powered by a hybrid diesel/batteries engine for reduced noise and air pollution.

For more information please contact Simon on M07899792183.


Friday, 16 June 2017

Envirecover Waste Plant

External window cleaning was part of the final preparations for the official opening of the new incinerator plant at Hartlebury Trading Estate, Kidderminster.
The EnviRecover plant will transform 200,000 tonnes of non-recyclable waste into electricity each year - enough to power 32,000 homes.

Tuesday, 7 February 2017

Roof and tree works at Hagley Hall

Hagley Hall is the home of 12th Viscount Cobham with part of the house available for both private and corporate functions.

Our work included roof repairs to the random slate on the house corner towers and a height reduction of the beech trees on the front lawn.

Reduction in height to trees on the main lawn
Ground protection boards in use
For more information on our high access maintenance services please visit http://www.overheadworks.co.uk/Maintenance.aspx

Tuesday, 27 September 2016

High rise tower block window cleaning


The St John’s tower blocks in Worcester are managed by Fortis Living and our work involved window cleaning to the communal staircases. The cleaning process included the use of rain harvested purified water to enable a thorough cleaning of both frames and glass

View from the top at 37 meters
High rise window cleaning using a 37 meter crawler mounted platform
Purified water was used for a thorough clean of glass and frames
 
For more information on overhead cleaning works please visit http://www.overheadworks.co.uk/Cleaning.aspx

New signage fitted at Kingsholm Stadium

Gloucester Rugby club contacted us to fit new signage for the start of the new season.
Fitting signage working from the pitch
Note ground protection used - three days before start of the new season

 For more information on our high access maintenance services please visit http://www.overheadworks.co.uk/Maintenance.aspx

Lift and fit work using machine winch

An industrial roof cowl was safely lifted and fitted into place using our custom built winch attachment at Envirosort in Worcestershire.

Industrial Roof Cowl mid lift
Industrial Roof Cowl lift


  















Gently placed on the roof next to man safe provision
Fitted working from the roof man safe provision
For more information on our high access maintenance services please visit http://www.overheadworks.co.uk/Maintenance.aspx

Monday, 23 May 2016

Rain harvested purified water for sale


Ultra pure water is collected and used by local window cleaners and aquarium owners all over Worcestershire. 
  •  18 Meg ultra pure 0 parts per billion
  •  Rain water harvested
  •   UV filtered
  •  Simple collect and load arrangement 24/7
  • Supplied hot or cold

Contact Simon on 07899 792183